Breaking News
Loading...
Thursday 30 November 2006

Info Post
The first electricity generated by nuclear power was produced December 20, 1951, soon to be 55 years ago, at the Experimental Breeder Reactor #1 (EBR-1) in Idaho.

For a comparison of past vs. present practices, that pioneer nuclear power plant was announced March, 1949. The first, albeit token, juice was produced 33 months later.

Yesterday, I participated in a scheduling meeting for the next new nuke. It will take us 14 months to mobilize then prepare and submit the application - and that's for a proven, certified design. First safety-related concrete pour takes another 24+ months following combined construction and operating license (COL) approval.

The take-home point is that the very first nuclear power plant was designed, built, tested, and on-line in the time it takes for a contemporary project to complete its paperwork.

Now, granted, there is a huge difference between EBR-1's 500 watts and tomorrow's 1400 megawatts, but those pioneers built their new, experimental reactor to be cooled with molten sodium metal while our plants are the result of 50 years of painstaking development and refinement of the light water reactor.

Perhaps the NRC's rules on "Limited Work Authorizations" (LWAs) could use some tweaking?

Technorati tags: , , , , ,

0 comments:

Post a Comment