The environmentalists should love this. There is no danger of "The China Syndrome", the is no pollution as in fossil fuel plants, and there will be enough room on site for the spent fuel to be stored in dry storage tanks within the PBMR building. Finally, a PBMR lasts for 40 years and takes 24 months to build.
Technorati tags: Nuclear Energy, Environment, Energy, Politics, Technology, Economics
0 comments:
Post a Comment